Posts Tagged ‘Earned Value Reporting’

5 Steps to Master Project and Finance Transparency

by Hard Dollar on September 23rd, 2011

Does it ever feel like you’ve hit a brick wall between your project data and your ERP system?

Project data can literally get into the minutiae when tracking estimating activities, productivity, and resources; as well as when managing controls with data on percent complete, progress quantity, labor, equipment, etc. Yet on the ERP side, you are operating at a higher level – analyzing cost codes, accruals, cash flow, etc. How do you reconcile the gap in translation between the two critical systems?

To make matters worse, there are typically three principals who input data into the system of record: the owner, the EPCM, and the contractor. This will usually result in inefficiencies in four areas:

  • Delays in reporting data
  • Inaccurate data
  • Summary/data misalignment
  • ERP lacking productivity and or earned value data

The key question then becomes, “What level of detail makes most sense?”

Let’s make this easy, in 5 steps:

  1. Eliminate internal speculation with a consistent method of measurement (quantity or percent complete)
  2. Report on summary ERP – capture detail progress
  3. Open progress to vendor input on measurements
  4. Leverage the schedule for true EVM  performance (SPI, CPI)
  5. Standardize the WBS for consistent current and historical measurement

Next, apply these principles to the common touch points in your ERP system: budget, time, receipts, progress, actual costs, and reconciliation.

This of course sounds great on paper, but how do you put it into practice? The assumption is that you are currently collecting data successfully – stay the course! There is no need to duplicate the information or force users to switch to a different system. The answer is to integrate the data so that your project and ERP systems are speaking the same language – and Hard Dollar is actually designed to do just that!

If you want to learn more about avoiding that brick wall between projects and ERP – listen to Hard Dollar VP, Ron Babich, address this during an online workshop or download the slides here.


Strategies Group Inc. Announces Partnership with Hard Dollar

by Hard Dollar on December 7th, 2009

Suwanee, GA – December 7, 2009Strategies Group Inc. is pleased to announce their partnership with Hard Dollar, a leading provider of Project Cost Management software to the Infrastructure, Environmental, Oil & Gas, Utilities, Industrial, and Mining industries. Hard Dollar’s award winning Project Cost Management software provides Estimating, Job Controls, Field Data Collection and real-time integration to Scheduling, Accounting, and Design resulting in complete project visibility and control.

(more…)


Instant Visibility Into Project Progress and Performance With HD

by Hard Dollar on December 4th, 2009

Scottsdale, AZ – December 4, 2009 – Hard Dollar Corporation, the leader in Project Cost Management today announced the release of Advanced Progress Tracking, adding instant visibility into progress and performance on planned activities, with side-by-side comparisons of the most critical factors that affect project success. Advanced Progress Tracking measures progress while increasing visibility to owners and contractors, increasing profits by 9% on average on every project, with real-time cost and productivity status and direct integration into finance.

Existing HD users can leverage the system to view side-by-side estimate vs. progress comparisons with direct integration to accounting, without adding additional systems or infrastructure. “Users can proactively correct potential productivity issues with transparent visibility into production trends, truly managing the project,” states Ron Babich, Hard Dollar VP of Sales and Marketing. “Accounting integration enables man hours, equipment hours, and quantities to be imported into accounting software for payroll, without duplicating entry. Owners and Construction Managers can now receive accurate information faster, satisfying regulatory and contractual requirements,” said Babich.

(more…)


Hard Dollar Announces Verano as New Partner

by Hard Dollar on November 9th, 2009

Scottsdale, AZ – November 9, 2009 – Hard Dollar Corporation, the leader in Project Cost Management systems delivering Increased Cost and Productivity Visibility, announced a partnership with Verano, the largest Oracle Primavera representative in South America. Both Hard Dollar and Verano are industry leaders in Construction and Engineering with clients in Mining and Oil and Gas, making this an ideal partnership.

“Partnering with Hard Dollar will provide a new integrated solution for managing projects in the South American market. The integration with Primavera will help provide clients the tools needed to save money and resources while giving them confidence in managing projects,” states Jorge Rossini, Commercial Director of Verano.

(more…)


Catalyst Announced as New Hard Dollar Partner

by Hard Dollar on November 4th, 2009

Scottsdale, AZ – October 16, 2009 – Hard Dollar Corporation, the leader in Project Cost Management systems delivering Increased Cost and Productivity Visibility announced a partnership with Catalyst, the largest Oracle Primavera representative in the United States serving the engineering and construction industry. Catalyst has a nationwide team of Primavera experts serving the market for more than 15 years. Teaming with Hard Dollar is a natural extension of Catalyst’s core competency and brings strong value to the traditional Primavera customer.

“This partnership gives us the ability to serve our clients by making it easier to connect project information resulting in simplified management of complex construction and capital projects, increased return on investment and more predictable project results,” states Paul Heidkamp, Executive Director of Sales.

(more…)


BIM Goes “5D,” Dramatically Reducing Construction Costs

by Hard Dollar on April 21st, 2009

Hard Dollar Introduces 5D-BIM Server Uniting Design, Resources, Cost, Schedule and Project Control to Deliver Centralized Project Management and Connectivity

April 21, 2009 – Scottsdale, AZ – Hard Dollar Corporation, the industry innovator of Project Cost Management, today announced the industries first 5D-BIM Server (Building Information Modeling) providing dynamic “Oneness” integration between CAD designs, estimating, scheduling, project controls, and accounting; fulfilling the industry’s vision of elevating BIM to the 5D level. According to McGraw-Hill Construction’s SmartMarket Report on BIM, “Contractors reported achieving up to a 1,000% ROI using BIM” and should experience even greater returns once 4D and 5D capabilities become available.

(more…)


New Mobile Device Support Helps Contractors

by Hard Dollar on February 5th, 2009

Hard Dollar Releases Wireless Hand Held Software for Microsoft CE and Other Hand Held Devices

February 5, 2009, Scottsdale, AZ – Hard Dollar today announced the release of its Field Data Collection software for use on Microsoft CE platform devices, smart phones and other wireless hand held devices. The new mobile wireless software enables field based employees for contractors to rapidly and easily collect time sheet information, expenses, equipment usage, project notes, material usage and productivity data and instantly update the corporate Project Cost Management.

(more…)