Microsoft® Project and Primavera® Integration
Microsoft® Project and Primavera® Integration Keeps Budgets and Schedules In-Sync
Keeping detailed budgets and schedules in-sync would be easy if your projects never changed. Hard Dollar’s real-time integration with Microsoft® Project or Primavera® allows you to make changes one time and simultaneously update the budget and schedule. No more copying and pasting, no more importing and exporting.
- Create cost and resource-loaded schedules* in record time.
- Easily keep the work plan, budget, and schedule in-sync when things change, such as project scope, item quantities, shift arrangements, and more.
- Maintain tasks in the estimate that do not appear in the schedule.
- Maintain tasks in the schedule that are not synchronized with the estimate*.
- Run “what if?” scenarios across the budget and schedule to easily evaluate the impact of alternative resources, shift arrangements, production rates, and more.
- Streamline analysis of cash flow, earned value, and resource utilization with flexible, built-in tools and graphical output.
With Hard Dollar and Microsoft® Project or Primavera® working together in real-time you’ll cut valuable time out of the process, and have instant answers to the toughest “what if?” questions that come your way.
Create Cost-Loaded Schedules in Record Time
- Create Hard Dollar projects from existing schedules*.
- Automatically load cost items (activities), estimated durations, and costs from Hard Dollar projects into the schedule.
- Select which cost items from the Hard Dollar project to include as activities in the schedule.
- Roll-up multiple cost items from the Hard Dollar project into single activities in the schedule.
- Drive schedule durations from estimated durations in Hard Dollar, including productivity-based durations.
- Drive schedule durations from “plug” durations in Hard Dollar, allowing schedules to show different durations than the assumptions made in the budget.
Keep the Work Plan, Budget, and Schedule In-Sync When Things Change
- Take advantage of one-click, real-time synchronization between the Hard Dollar project and the schedule (no import/export required).
- Automatically update activity IDs, descriptions, durations, resources, and costs* when changes are made to the Hard Dollar project.
- Automatically update durations, start dates, and finish dates in the Hard Dollar project when changes are made to the schedule.
- Automatically launch the linked schedule from within a Hard Dollar project with a single mouse click.
- Control what information gets passed between Hard Dollar and the schedule on a project by project basis*.
Run “What if?” Scenarios Across the Budget and Schedule
- Perform “what if” analysis to simultaneously see the cost and timing impact of changes made to either the Hard Dollar budget or the schedule.
- Change production rates or crew configurations in the Hard Dollar project and instantly see the resulting impact in the schedule.
- Change shift arrangements in the Hard Dollar project and instantly see the impact on the schedule.
- Change quantities in the Hard Dollar project and instantly see the impact on the schedule.
- Make changes to durations in the schedule (e.g., drag bars to make them longer or shorter) and instantly determine the production rates required in the Hard Dollar project to hit the new scheduled duration.
Streamline Analysis of Cash Flow, Earned Value, and Resource Utilization
- Simplify earned value analysis and reporting using powerful tools in both Microsoft® Project or Primavera® and Hard Dollar.
- Produce detailed cash flow graphs with ability to control cost and revenue curves, finance expense, and payment timing.
- Produce detailed resource utilization graphs showing resource usage and cost over time for individual resources or resource types.
- Export cash flow and resource utilization data to Excel with a single mouse click.
(Versions supported - Primavera: 5.0 – 6.2; Microsoft Project: 2002, 2003, 2007.
* Supported in Primavera only.)